The West Riverside Interconnection Project involves a new 4.5 – 6 mile, double-circuit, 345-kV transmission line from the Riverside Energy Center to an existing 345-kV line. The project is needed to connect the new power plant to the grid.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
American Transmission Company 4.2 345 WI WI 2019
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
43 Under Construction Riverside Energy Center Combined Cycle Paddock-Sheepskin 345kV Line
Interstate Build Start NERC ISO/RTO Country Project Partners
2018 MRO MISO US