The West Riverside Interconnection Project involves a new 4.5 – 6 mile, double-circuit, 345-kV transmission line from the Riverside Energy Center to an existing 345-kV line. The project is needed to connect the new power plant to the grid.
The West Riverside Interconnection Project involves a new 4.5 – 6 mile, double-circuit, 345-kV transmission line from the Riverside Energy Center to an existing 345-kV line. The project is needed to connect the new power plant to the grid.
Project Sponsor | Line Miles | Voltage (kV) | From State | To State | Year in Service |
---|---|---|---|---|---|
American Transmission Company | 4.2 | 345 | WI | WI | 2019 |
Estimated Costs ($M) | Voltage Type | Project Status | Project Group | Origin Point | Destination Point |
43 | Under Construction | Riverside Energy Center Combined Cycle | Paddock-Sheepskin 345kV Line | ||
Interstate | Build Start | NERC | ISO/RTO | Country | Project Partners |
2018 | MRO | MISO | US |