Stonebrook Project

Brazos Electric Power Cooperative is planning the Stonebrook project to provide increased capacity and reliability of Benton County, TX. The double circuit, 138-kV line would run approximately 2.9 to 4.5 miles from a new substation east of Lake Lewsville to a tap along an existing 138-kV line west of the North Dallas Tollway.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Brazos Electric Cooperative 4.5 138 TX TX 2018
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
34.3 Suspended Stonebrook Substation North Dallas Tollway Tap
Interstate Build Start NERC ISO/RTO Country Project Partners
2017 TRE ERCOT US