The Scurry County South to Long Draw Line project is 50.7 miles of two 345 kV circuits sharing common towers. The estimate cost of the project was projected at $96.4 million. Construction began in January 2012 and was completed in September 2013.
The Scurry County South to Long Draw Line project is 50.7 miles of two 345 kV circuits sharing common towers. The estimate cost of the project was projected at $96.4 million. Construction began in January 2012 and was completed in September 2013.
Project Sponsor | Line Miles | Voltage (kV) | From State | To State | Year in Service |
---|---|---|---|---|---|
Wind Energy Transmission Texas LLC | 51 | 345 | TX | TX | 2013 |
Estimated Costs ($M) | Voltage Type | Project Status | Project Group | Origin Point | Destination Point |
96.4 | Operating | CREZ | Scurry County South | Long Draw | |
Interstate | Build Start | NERC | ISO/RTO | Country | Project Partners |
2012 | TRE | ERCOT | US |