Sale Ranch to Natural Dam

The Sale Ranch to Natural Dam project is a planned transmission line to accommodate new load growth in Howard and Martin counties, TX. The project will be designed at 145-kV and operated as a 138-kV transmission line, with project routes ranging from 16.8 to 19.2 miles in length between the existing Sale Ranch and Natural dam substations. The preferred 16.8-mile route is expected to cost $17.4m with the entire project expected to be completed by summer 2017.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Sharyland Utilities LP 16.8 138 TX TX 2017
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
17.4 Operating Sale Ranch Substation Natural Dam Substation
Interstate Build Start NERC ISO/RTO Country Project Partners
2017 TRE ERCOT US