Riverton – Sand Lake

The Riverton to Sand Lake project involves a new 38.8-mile, 345-kV transmission line between the proposed Riverton and Sand Lake substations. The project is needed to address future load growth and reliability concerns in Reeves County, TX, with the increased Permian Basin activities.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Oncor Delivery Company LLC 38.8 345 TX TX 2019
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
58.6 Planned Riverton Switching Station Sand Lake Switching Station
Interstate Build Start NERC ISO/RTO Country Project Partners
TRE ERCOT US