The Prince George County Rebuild is a planned rebuild of approximately 9.9 miles of existing 230-kV double circuit transmission lines between Burtonsville substation to the Takoma substation. The project will use existing right-of-ways with new steel pole structures.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Potomac Electric Power Co 9.9 230 MD MD 2016
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
35 Suspended Burtonsville Takoma
Interstate Build Start NERC ISO/RTO Country Project Partners
RFC PJM US