Possum Point Rebuild

The Possum Point rebuild involves replacing two 115-kV transmission lines. The included lines are the Possum Point – Smoketown Line #18 and #145. Both lines will be built at 230-kV standards but continue to operate at 115-kV to ensure reliability. The $18.8m project is expected to be completed by 2019.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Dominion Virginia Power 8.5 115 VA VA 2019
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
18.8 Planned Possum Point Combined Cycle Power Station Smoketown
Interstate Build Start NERC ISO/RTO Country Project Partners
SERC PJM US