Parvin Transmission Project

The Parvin Transmission Project is a planned 138-kV transmission line that will run from the proposed Parvin Substation to a tap on the existing Navo-Krugerville 138-kV line. There are various routes being considered that range from 3.8 miles to 11.7 miles. The final route will be selected once further study is completed. The project will serve the growing electricity demand in the Denton County, TX, region.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Brazos Electric Cooperative 11.7 138 TX TX 2017
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
39 Operating Parvin Substation Navo - Krugerville Line
Interstate Build Start NERC ISO/RTO Country Project Partners
2017 TRE ERCOT US