North Shreveport-Longwood Transmission Line Rebuild Project

The North Shreveport – Longwood Transmission Line Rebuild Project involves replacing 16 miles of existing 138-kV transmission line. The project begins at the Arsenal Hill substation and terminates at the Longwood substation. The project will ensure reliability at an estimate cost of $18m.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Southwestern Electric Power Co. 16 138 LA LA 2019
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
18 Planned Arsenal Hill Longwood
Interstate Build Start NERC ISO/RTO Country Project Partners
2018 SERC US