New Westminster is a 2-mile, 60-kV underground transmission line that originates at New Westminster Substation and terminates at the Lakefield Drive TAP. The project, which is sponsored by BC Hydro, will cost C$38 million. The project came online in May 2015.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
BC Hydro and Power Authority 2 60 BC BC 2015
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
38 Operating New Westminister Lakefield Drive TAP
Interstate Build Start NERC ISO/RTO Country Project Partners
2012 WECC CA