Martinsville to Chireno

The Martinsville to Chireno project involves a new 138-kV transmission line in Nacogdoches County, TX. The project is needed to provide a looped transmission service to its cooperative members. The preferred route of the project involves 11 miles of new right-of-way at a cost of $11.7m. Tex-La Electric Cooperative of Texas expects to energize the line by summer 2019.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Tex-La Electric Cooperative of Texas Inc. 11 138 TX TX 2019
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
11.7 Planned Martinsville Chireno Substation
Interstate Build Start NERC ISO/RTO Country Project Partners
2019 TRE ERCOT US