Marshall Ford to Lago Vista

LCRA TSC will upgrade the capacity of an existing 6.5-mile, 138-kilovolt (kV) transmission line by replacing all of the conductor and structures. The project’s purpose is to better accommodate significant load growth in the area.  It will cost $8 Million, with construction planned to start in Fall of 2014, and operations in March 2015.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Lower Colorado River Authority 6.5 138 TX TX 2015
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
8 Operating Marshall Ford Lago Vista
Interstate Build Start NERC ISO/RTO Country Project Partners
No 2014 TRE ERCOT US