
The Mark Twain Transmission Project is classified as a multi-value project (MVP) in the MISO 2011 expansion plan. The project will create a 345-kV path through central and eastern Missouri, beginning at the Iowa state line, continuing to the Zachary substation near West Adair, and continuing to the Maywood substation near Palmyra.