Littman – Phillips Andrews

The Littman to Phillips Andrews project involves a new 11.1-mile, 138-kV transmission line between the existing Littman substation and proposed Phillips Andrews Tap in Andrew County, TX. The $9.7m project is needed to support continued load growth in the region and is expected to be complete by summer 2018.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Oncor Delivery Company LLC 11.1 138 TX TX 2018
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
9.7 Planned Littman Substation Phillips Andrews Tap
Interstate Build Start NERC ISO/RTO Country Project Partners
TRE ERCOT US