The Landstown-Virginia Beach Line Upgrade is a 230-kV line built within the existing right-of-way corridor that extends approximately 11 miles from the Virginia Beach Substation off of Laskin Road, to the Landstown Substation off Princess Anne Road. Dominion replaced the existing lattice-style towers with H-frame structures and wires with greater capacity. The new structures are approximately the same height as the original structures. The line went into operation December 2012.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Dominion Energy 11 230 VA VA 2012
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
25 Operating Landstown Virginia Beach
Interstate Build Start NERC ISO/RTO Country Project Partners
No 2011 SERC PJM US