Kittyhawk Transmission Line and Substation Project

The Kittyhawk Transmission Line and Substation Project involves 4-10 miles of new 138-kV transmission line in Collin County, TX. The project is needed to address load growth in the region.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Brazos Electric Cooperative 10 138 TX TX 2019
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
25.5 Under Construction Craig Ranch Substation North Allen and Sloan Creek Line
Interstate Build Start NERC ISO/RTO Country Project Partners
2018 TRE ERCOT US