Iatan to Nashua

Iatan to Nashua is a 30-mile line, 345-kV transmission line, originating at Iatan Generating Station, Mo., and terminating at Nashua Substation, Mo. The transmission line, proposed by Transource Energy, cost $64.8 million and went into service in April 2015. The project has been established to reduce congestion within region. The project will improve service in the northwest Missouri region.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Transource Energy LLC 30 345 MO MO 2015
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
65 Operating Iatan 1-2 Generating Station Nashua
Interstate Build Start NERC ISO/RTO Country Project Partners
SPP SPP US American Electric Power and Great Plains Energy