Hereford to White Deer Line

The Hereford to White Deer Line is a 91-mile line, 345-kV single circuit (built on poles capable of double circuit) transmission line, originates at the Hereford substation in Deaf Smith County, Texas, and terminates at the White Deer station in Carson County, Texas. The transmission line, sponsored by Sharyland Utilities, cost approximately $134.6 million. Construction on the project started in September 2011 and was completed in August 2013. Sharyland Utilities is a subsidiary of Hunt Consolidated Energy a division of Hunt Consolidated Inc. of Dallas, Texas.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Sharyland Utilities LP 91 345 TX TX 2013
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
134.6 Operating CREZ Hereford White Deer
Interstate Build Start NERC ISO/RTO Country Project Partners
2011 TRE ERCOT US