Hale Wind Interconnect

The Hale Wind Interconnect involves a new 14.6-mile, 230-kV transmission line between the existing TUCO substation and planned Hale Wind Collection substation in Hale County, Texas. The $9.4m project is needed to tie in the proposed Hale Wind Farm to the local grid.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Southwestern Public Service Co. 14.6 230 TX TX 2018
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
9.4 Planned Tuco Hale Wind Collection Substation
Interstate Build Start NERC ISO/RTO Country Project Partners
TRE ERCOT US