Flowood Transmission Line

The Flowood Transmission Line involves a new 4.5 mile, 161-kV transmission line from the existing Sebastopol – Langford line to a  new Flowood substation to ensure reliability in Flowood, MS. The project is expected to be completed in 2021 at a cost of $4m.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Tennessee Valley Authority 4.5 161 MS MS 2021
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
4 Planned Sebastopol - Langford Flowood
Interstate Build Start NERC ISO/RTO Country Project Partners
2020 SERC US