Dooms to Bremo Rebuild Project

The Dooms to Bremo Rebuild Project involved the reconductoring of 45 miles of 115-kV transmission to single circuit 230-kV line.  The project originates at the Dooms substation and approximately 20 miles to the Sherwood Junction substation.  The line then runs about 25 miles from Sherwood Junction to the Bremo substation in Virginia.  The project was build to improve reliability in the region. The project was completed early 2015 at a cost of $69m.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Dominion Energy 45 230 VA VA 2015
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
69 Operating Dooms Substation Bremo
Interstate Build Start NERC ISO/RTO Country Project Partners
2014 SERC PJM US