Dent Road Expansion to Wieland Switch 138-kV Transmission Line

The Dent Road Expansion to Wieland Switch 138-kV Transmission Line involves a new 6.85 to 10.9 mile line from the existing Dent Road substation to a proposed Wieland switching station.. The project is being built to improve reliability in Wieland, TX. Rayburn Country Electric Cooperative expects to complete the line in 2019 at a cost of approximately $6.6m.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Rayburn Country Electric Cooperative Inc. 8.2 138 TX TX 2019
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
6.6 Planned Dent Road Substation Wieland Switching Station
Interstate Build Start NERC ISO/RTO Country Project Partners
2018 TRE ERCOT US