Chinook

Chinook, is a 1000-mile line, 500-kV DC transmission line from Harlowton, MT, west to Townsend, then south to Borah and then south through eastern Nevada to the Eldorado Valley, NV. The project will enable up to 3,000 MW of electricity generated in Montana delivered to the Las Vegas area. The project is proposed by TransCanada Energy. The current in-service date for Chinook is 2021.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
TransCanada Corporation 1000 500 MT NV 2021
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
3000 Conceptual Harlowton, MT Eldorado Valley, NV
Interstate Build Start NERC ISO/RTO Country Project Partners
2019 WECC US