Cedar Lake 115-kV Transmission Project

The Cedar Lake project involves a new 4.5-mile, 115-kV transmission line in Scott County, MN. The project is needed to serve a new pipeline pump station proposed by Minnesota Pipe Line Company.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Great River Energy 4.5 115 MN MN 2017
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
5 Operating Cedar Lake Substation MV-EV/X Transmission Line
Interstate Build Start NERC ISO/RTO Country Project Partners
2017 MRO MISO US