Bluff Creek to Brown Line

Bluff Creek to Brown Line is an 87-mile, double-circuit, 345-kV transmission line that originates at the Bluff Creek station located in Taylor County and terminates at the Brown switching station located in Brown County, Texas. The project, proposed by Oncor Electric Delivery Co., cost $110m. Construction on the project was completed and the line energized on June 16, 2012.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Oncor Delivery Company LLC 87 345 TX TX 2012
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
110.3 Operating CREZ Bluff Creek Station Brown Switching Station
Interstate Build Start NERC ISO/RTO Country Project Partners
2011 TRE ERCOT US