Bee Branch to Damascus Rebuild

The Bee Branch to Damascus Rebuild involves replacing 7.1 miles of existing 161-kV transmission line. The project is needed to ensure reliability in the region.

Project Sponsor Line Miles Voltage (kV) From State To State Year in Service
Petit Jean Electric Cooperative 7.1 161 AR AR 2017
Estimated Costs ($M) Voltage Type Project Status Project Group Origin Point Destination Point
6.6 Operating Bee Branch Damascus Substation
Interstate Build Start NERC ISO/RTO Country Project Partners
2017 SERC US