Pigeon Run Solar seeks regulatory approval in Virginia for battery storage project

A solar facility would be built within an approximately 612-acre parcel, with the BESS built on about 1.1 acres within the solar facility project site

You must be logged in to view this content.

 

Please register to access exclusive content on TransmissionHub.com.

About Corina Rivera-Linares 3263 Articles
Corina Rivera-Linares, chief editor for TransmissionHub, has covered the U.S. power industry for the past 15 years. Before joining TransmissionHub, Corina covered renewable energy and environmental issues, as well as transmission, generation, regulation, legislation and ISO/RTO matters at SNL Financial. She has also covered such topics as health, politics, and education for weekly newspapers and national magazines. She can be reached at clinares@endeavorb2b.com.