Virginia DEQ issues recommendations for Dominion’s proposed 230-kV rebuild project

As TransmissionHub reported, Dominion’s desired in-service date for the project is April 15, 2022, and the estimated conceptual cost of the project is about $4.8m (2020 dollars)

You must be logged in to view this content.

 

Please register to access exclusive content on TransmissionHub.com.

About Corina Rivera-Linares 3105 Articles
Corina Rivera-Linares, chief editor for TransmissionHub, has covered the U.S. power industry for the past 15 years. Before joining TransmissionHub, Corina covered renewable energy and environmental issues, as well as transmission, generation, regulation, legislation and ISO/RTO matters at SNL Financial. She has also covered such topics as health, politics, and education for weekly newspapers and national magazines. She can be reached at clinares@endeavorb2b.com.