ETT seeks regulatory approval in Texas of 345-kV line proposed to interconnect 200-MW solar facility

ETT said that the proposed line is designed to directly interconnect a new transmission service customer, BayWa r.e. Solar Projects, LLC (BayWa), into the ETT Lobo 345-kV station

You must be logged in to view this content.

 

Please register to access exclusive content on TransmissionHub.com.

About Corina Rivera-Linares 3286 Articles
Corina Rivera-Linares was TransmissionHub’s chief editor until August 2021, as well as part of the team that established TransmissionHub in 2011. Before joining TransmissionHub, Corina covered renewable energy and environmental issues, as well as transmission, generation, regulation, legislation and ISO/RTO matters at SNL Financial from 2005 to 2011. She has also covered such topics as health, politics, and education for weekly newspapers and national magazines.