Pennsylvania OCA, Transource PA file stipulation and settlement regarding proposed project

The Pennsylvania Office of Consumer Advocate (OCA) and Transource Pennsylvania, LLC (Transource PA) on July 10 filed with the Pennsylvania Public Utility Commission (PUC) a joint petition for stipulation and settlement of all issues regarding Transource PA’s application to begin supplying electric transmission service in Franklin and York counties in Pennsylvania.

Mid-Atlantic Interstate Transmission, LLC (MAIT) and PECO Energy Company, the other parties in the proceeding (Docket Nos. A-2017-2587821 and G-2017-2587822), have indicated that they do not oppose the settlement, according to the filing.

As TransmissionHub reported, the OCA, in a March 6 protest filed with the PUC, requested that the PUC not approve at this time Transource PA’s application, saying that it is filing the protest in order to ensure that the application is approved only if it is “necessary or proper for the service, accommodation, convenience or safety of the public.”

Under the settlement, the OCA and Transource PA agree that the PUC should approve Transource PA’s Feb. 7 application, subject to certain conditions.

According to Transource PA’s application, to address transmission congestion constraints across the Pennsylvania and Maryland border, PJM Interconnection approved a market efficiency project, identified by PJM as Baseline Upgrade Numbers b2743 and b2752, and described from time to time as Project 9A. Baseline Upgrade Numbers b2743 and b2752 involve upgrades at existing substations in Maryland, two new substations in Pennsylvania, and two new interstate transmission lines between Maryland and Pennsylvania, Transource PA added.

The core of that baseline upgrade project comprises the transmission facilities designated by PJM to be built, owned, maintained, and operated by Transource PA and Transource Maryland, LLC (Transource MD), which together are referred to as the Independence Energy Connection project.

Transource PA also noted that it and Transource MD are wholly owned direct subsidiaries of Transource Energy, LLC, which is indirectly owned by a partnership between American Electric Power (NYSE:AEP) and Great Plains Energy (NYSE:GXP) (GPE).

Transource PA said that upon receipt of all necessary approvals, Transource MD would build, own, operate, and maintain the Maryland portions of two proposed 230-kV interstate transmission lines associated with the Independence Project.

Noting that it is responsible for the Pennsylvania portion of the Independence Project, Transource PA said that it would build, own, maintain, and operate two new electric transmission substations in Pennsylvania, as well as the Pennsylvania portions of two new 230-kV interstate transmission lines that constitute the Pennsylvania portion of the Independence Project.

Pertinent to the Feb. 7 application, the company noted that the Pennsylvania portion of the Independence Project as approved by PJM involves:

  • Construction of two new substations in Pennsylvania – the Rice and Furnace Run substations
  • Construction of the Pennsylvania portion of two new, overhead, double-circuit, 230-kV interstate transmission lines – the Rice-Ringgold 230-kV Transmission Line and Furnace Run-Conastone 230-kV Transmission Line – as well as associated structures, equipment, and other facilities necessary to operate the lines

Upon receipt of all necessary approvals, the new Rice-Ringgold line would be sited to extend about 27 miles, connecting the existing Ringgold substation, which is located near Smithsburg, Washington County, Md., and the new Rice substation, to be located in Franklin County.

In addition to interconnecting with the Ringgold substation, the new Rice substation would tie into the existing Hunterstown-Conemaugh 500-kV Transmission Line, the company said.

Upon receipt of all necessary approvals, the new Furnace Run-Conastone line would be sited to extend about 15 miles, connecting the existing Conastone substation, which is located near Norrisville, Harford County, Md., and the new Furnace Run substation, to be located in York County.

The company added that in addition to interconnecting with the Conastone substation, the new Furnace Run substation would tie into the existing Three Mile Island-Peach Bottom 500-kV Transmission Line.

Upon completion of the Independence Project, and subject to receipt of all necessary approvals, Transource PA would provide electric transmission service within a transmission corridor to be sited from the new Rice substation in Franklin County to the Pennsylvania/Maryland border. Transource PA added that it would also provide electric transmission service within a transmission corridor to be sited from new Furnace Run substation in York County to the Pennsylvania/Maryland border.

As a prerequisite to carry out that needed utility work in Pennsylvania, Transource PA said that it seeks commission approval to begin to furnish and supply electric transmission service to, or for, the public through two new 230-kV transmission lines to be sited and located in Franklin and York counties.

According to Transource PA’s July 10 statement in support of the joint petition, the company intends to file full siting applications with the commission for its proposed Independence Project, likely by the end of 2017.

Approval of the joint petition and the issuance of a certificate of public convenience will allow:

  • The commission to determine Transource PA’s public utility status prior to the filing of full siting applications
  • Transource PA to effectively and efficiently prepare siting applications to build projects determined by PJM to be necessary and in the public interest
  • Transource PA to avoid and/or mitigate potential environmental issues during the transmission line siting process, to the extent reasonably possible

According to the OCA’s statement in support of the joint petition, the settlement provides that the certificate of public convenience issued to Transource PA should demarcate a service area of Franklin and York counties, and the commission’s issuance of a certificate of public convenience and demarcation of a service area does not constitute approval of any project proposed for the service area, including the Independence Project.

The settlement further provides that Transource PA will seek commission approval prior to modifying affiliate agreements or entering into new affiliate agreements, the OCA noted.

Under the terms of the settlement, the intervenors reserve all rights to challenge the need for the Independence Project when Transource PA files a siting application with the commission or to challenge any other project proposed by Transource PA, the OCA said.

About Corina Rivera-Linares 3058 Articles
Corina Rivera-Linares, chief editor for TransmissionHub, has covered the U.S. power industry for the past 15 years. Before joining TransmissionHub, Corina covered renewable energy and environmental issues, as well as transmission, generation, regulation, legislation and ISO/RTO matters at SNL Financial. She has also covered such topics as health, politics, and education for weekly newspapers and national magazines. She can be reached at clinares@endeavorb2b.com.