
Penelec proposes new 17.6-mile, 115-kV line in Pennsylvania
About 10.4 miles of the line would require new right of way, while the remaining 7.2 miles involve rebuilding a section of Penelec’s existing Bedford North-New Baltimore 115-kV transmission line, which is located in Napier, East St. Clair, and Bedford townships in Bedford County.