Interconnect deal filed for 160-MW OCI Alamo 6 solar project

Filed on Dec. 18 at the Texas Public Utility Commission was a Standard Generator Interconnection Agreement, dated Dec. 17, between LCRA Transmission Services and OCI Alamo 6 LLC for a 160-MW (ac) solar project in Pecos County.

The agreement covers two project phases:

  • Phase I – 110 MW (ac) in size to be in commercial operation by May 31, 2016; and
  • Phase II – 50 MW (ac) in size to be commercially operating by Sept. 30, 2016.

The project will interconnect to the grid at LCRA’s new TSC Tunas Creek Substation in Pecos County.

A project contact is: OCI Alamo 6 LLC, Attn: Paul Whitacre, Vice President of Operations, 300 Convent Street, San Antonio, TX 78205, Fax: 210-453-3240, phone: 210-453-3115, pwhitacre@ocisolarpower.com. 

About Barry Cassell 20414 Articles
Barry Cassell is Chief Analyst for GenerationHub covering coal and emission controls issues, projects and policy. He has covered the coal and power generation industry for more than 24 years, beginning in November 2011 at GenerationHub and prior to that as editor of SNL Energy’s Coal Report. He was formerly with Coal Outlook for 15 years as the publication’s editor and contributing writer, and prior to that he was editor of Coal & Synfuels Technology and associate editor of The Energy Report. He has a bachelor’s degree from Central Michigan University.