Recurrent Energy unit seeks EWG status for 15-MW solar project

RE Columbia Two LLC, which is controlled by Recurrent Energy LLC, on Dec. 12 filed at the Federal Energy Regulatory Commission a notice of self-certification of Exempt Wholesale Generator (EWG) status.

The filing is in respect to RE Columbia Two’s ownership and prospective operation of an approximately 15-MW solar photovoltaic facility and related assets located in Kern County, Calif., which is within the California Independent System Operator (CAISO) balancing authority area.

Columbia Two anticipates that the solar facility will commence commercial operation by Dec. 31, 2014. The facility will be interconnected to the distribution system owned by Southern California Edison and all of the output from the facility will be sold exclusively at wholesale under a 20-year power purchase agreement with the Southern California Public Power Authority.

The developer contact is: Judith Hall, 
Chief Legal Officer, 
Recurrent Energy LLC, 
300 California Street, 7th Floor, San Francisco, CA 94104, Phone: (415) 675-1500 legal@recurrentenergy.com.

About Barry Cassell 20414 Articles
Barry Cassell is Chief Analyst for GenerationHub covering coal and emission controls issues, projects and policy. He has covered the coal and power generation industry for more than 24 years, beginning in November 2011 at GenerationHub and prior to that as editor of SNL Energy’s Coal Report. He was formerly with Coal Outlook for 15 years as the publication’s editor and contributing writer, and prior to that he was editor of Coal & Synfuels Technology and associate editor of The Energy Report. He has a bachelor’s degree from Central Michigan University.